Redeveloping the East End
The strategy for the lower East End sites being targeted for cleanup is modeled after
the successful redevelopment of Wentfield Park in the City’s West End. Top
priorities that the community has identified for the redevelopment of the
neighborhood include affordable housing and recreational open space. See
Attachment A – Community Survey.
The initial step in the design process for the Bridgeport East End Brownfield
Demonstration Project was a survey of community representatives. This survey was
completed in a typical two-part process: Interviewing selected representatives; and,
performing a rudimentary analysis of the developed data. The highest desired uses
were single-family housing types, open space and recreation, as well as a small
commercial site (convenience store). The last item was initially included in the
preliminary design, but a number of significant factors caused its removal in the final
proposal. (Source: PRE/view Landscape Architects Summary document)
The three parcels are currently being targeted for cleanup activities. Each parcel will
tie into the overall goals for the East End. Parcel 1 will be developed into affordable
housing and Parcel 2 will be recreational open space and parking to support the
surrounding housing development and existing neighborhood. Parcel 3 will be
redeveloped into additional affordable housing. The proposed redevelopment of each
parcel will provide new quality housing opportunities for residents and help to
stabilize the neighborhood. As the parcels are redeveloped and beautified, further
economic investment will be more likely to come to the area. Cleanup will also
improve the immediate environment including ground water and water quality in
Johnson’s Creek. (Source: Brownfields Assessment Grant Application, March 5,
2004)
1. East End Brownfield Demonstration Project – Mixed Use Plan
Before proposing any conceptual building types, it was clear that the plan should
acknowledge the adjacent homes and industrial land uses by providing a reasonable
similarity to the existing sizes of homes and a buffer between the existing industrial
users and proposed housing. Whereas the former could be accomplished with
graduated building
sizes and/or uses
(e.g., single family
to duplex to triplex,
etc., and vice
versa), the latter
typically calls for
an adequate area to
provide a
landscape screen of
trees and shrubs to
act as a buffer. The
buffers could be
used to assure
privacy of the
residential users; reduce the impact of a change in land uses (e.g., different building
orientations or setback requirements for new buildings could end up with fronts of
new houses aligning with existing back yards); or, design the plantings to enhance
the views toward Johnson’s Creek. However, the on-site buffers are dependent on
constructing soil containers above the capping layer. (Source: PRE/view
Landscape Architects Summary document)
While making transitions from an existing land use to a proposed one may warrant
screening, it may also suggest the removal of the conflict. This opportunity of
design also gives us the prospect to develop better plans. In this case, rather than
providing a buffer for the vehicular traffic cutting through the site on Trowel Street,
it was decided by the design team to request the city close the street, thereby
eliminating the vehicular access, but still permitting pedestrian or bicycle access.
(Source: PRE/view Landscape Architects Summary document)
2. East End Brownfield Demonstration Project – Mixed Residential Plan
Perhaps the single most important factor in the design alternatives was the need to
develop the maximum number of housing units so that they will help distribute the
expense of the environmental clean-up and still provide housing at a reasonable
cost. The major difference between the two final plans was whether or not to
recommend the closing of Trowel Street. In the final design plan, it was
recommended that Trowel Street be closed and the area be converted to pedestrian
access. Existing subsurface utilities make the former street an unlikely area for the
expansion of housing, but do provide an area for breaking up the architectural
mass. (Source: PRE/view Landscape Architects Summary document)
A variety of building
sizes were reviewed
because the eventual
sizes will be chosen
based on both market
conditions and
contractor preferences.
(It is expected that the
eventual developer for
this site would be
selected in an RFP
process that lets the
selected team define the actual building size.) The building sizes, shown in the
preliminary and final schematic plans, are in the range of 1000 SF to 1250 SF, but a
developer’s final market analysis may suggest other sizes, such as senior’s housing
in the 750 SF to 1000 SF range. The final building selection will most likely be all
housing in a condominium or cooperative land controlled project that maintains
environmental controls. (Source: PRE/view Landscape Architects Summary
document)
The buildings are conceived as New England style, contemporary colonial, usually
two or more stories high and shadow line asphalt roofing. The recommended
building and trim colors are from an historic palette; however, the builder and/or an
early occupants organization may also be the ones to select the final colors.
Hopefully the final buildings will be a subtle mix of colors, not unlike the
community, rather than uniform buildings common to low income housing
projects. (Source: PRE/view Landscape Architects Summary document)